So this weekend was about waste removal. We had 5-6k worth of form boards and wood that was used in the construction of the foundation. We got a dumpster up for recycling of the wood. Unfortunately in order to recycle we had to remove all the nails. So this weekend 2 of us went up there and pulled nails out of hundreds of boards and filled up a dumpster for boards to be recycled.
 |
the pile! |
 |
almost done with the pile! |
 |
at the end of the day.. dumpster mostly full |
We still ended up keeping alot of the 2x12's since theres still a ton of work left to do that may require some wood.
Your weekend looks almost as good as mine. I spent ALL day Saturday "air-hammering" concrete! Ouchhhhh.
ReplyDeletedoing the flooring?
ReplyDeleteyes sir
ReplyDelete