Gravel delivered and spread around so we don't end up with a mudslide...
Wednesday, February 26, 2014
Sunday, February 23, 2014
This weekends project! 2/22/14
So this past week they completed the pour of the entrance stair well walls as well as the retaining wall along the driveway. Our task this weekend was to remove all the formboards and backfill the drainage behind the retaining wall with drainrock then dirt. It was a lot of earthmoving for 1 day!
Some leveling remains for the driveway. After that we'll put some large rock so we can start taking deliveries all the way up the driveway.
View from the approach after we were done |
View from the street. You can see the massive pile of wood we took off, |
View from the garage |
Tuesday, February 18, 2014
Sunday, February 16, 2014
This weekends progress & digging shots..
We were out this long weekend digging. We had to get the top of the crawlspace lowered by about 6 inches to meet code (distance to wood). We're going to encapsulate the crawlspace but the building code doesn't account for that apparently. They also made good progress on the retaining wall for the driveway. Even with the large amount of rain I think we'll be able to finish this part of the project in the next week.
Driveway retaining wall being formed |
A view from the road looking at the driveway |
What we dug out. The requirement was 18" from the lower wall. |
View looking down once complete |
Sunday, February 9, 2014
Wednesday, February 5, 2014
Backfilling 2/5/14
Monday, February 3, 2014
Wood Recycling!
So this weekend was about waste removal. We had 5-6k worth of form boards and wood that was used in the construction of the foundation. We got a dumpster up for recycling of the wood. Unfortunately in order to recycle we had to remove all the nails. So this weekend 2 of us went up there and pulled nails out of hundreds of boards and filled up a dumpster for boards to be recycled.
We still ended up keeping alot of the 2x12's since theres still a ton of work left to do that may require some wood.
the pile! |
almost done with the pile! |
at the end of the day.. dumpster mostly full |
Subscribe to: