Monday, May 19, 2014

Doors!

This weekend we had our front doors delivered. Thank's to Jenson for lending a hand to move those big things up the stairs. We also had our back door delivered as well.


Jenson with our front door - fiberglass
Roofer guy also came by. Turns out the roof is probably the single biggest line item left on this build so I'm trying to cut costs where I can. The top color on the photo below is a material that I can buy a lot scrap from an old job of on craigslist. While the bottom would be new. Really depends what I can get the material for. Time to start negotiating.

Roof choices. Decisions decisions

Encountered one issue with the subfloor. We had a bunch of rain and standing water over the past month and a half on the site. These are guaranteed not to swell. Photo showing quite a bit of swelling occurred. The guys at the factory were very nice about offering free sanding. So I'll have to get some quotes from local floor sanders.

Sub floor swelling.