Drywall has been hung. Nice to see the actual walls in place. Now you get a feel for the sizes of rooms. It also brightened the house up alot.
Monday, August 4, 2014
Thursday, July 31, 2014
Additional runs for HVAC & HRV
After reviewing the house with our HVAC folks I noticed the entire mudroom/entrance area had no air supplies or returns. So I asked them to correct that feature and they added a HVAC supply and an HRV supply and return to the mudroom. Downside is I had to give up a small closet area to get those runs from upstairs to downstairs.
![]() |
| Runs coming from the celing down to the crawlspace, byebye closet |
![]() |
| 2 round holes are the HRV supply/return, rectangle is for the HVAC |
Blower door testing & bonus insulation
This was an interesting part. Steve our illustrious energy rater came by and did a blower door test to check for air leakage. He then did a survey with the IR camera looking for air infiltration. We did find some places, but overall we achieved 1810 CFM50, comes out to 2.8 ACH50. Which I'm told is quite good for first pass numbers. It should get tighter as we add drywall etc..
Also.. I bumped into Carlos one of our insulation guys who offered to insulate the whole garage for a small additional price.. so since that will be my man cave I splurged on it:
| Steve standing in front of the blower door |
![]() |
| normal view |
![]() |
| with IR |
Also.. I bumped into Carlos one of our insulation guys who offered to insulate the whole garage for a small additional price.. so since that will be my man cave I splurged on it:
| all garage walls insulated |
Thursday, July 24, 2014
The wonderful world of spray foam..
Stopped by the house this evening to check out the progress on the insulation. They have just about wrapped up the foaming portion. They look to be just doing the last bits of cleanup before they start the underfloor batts. From what I can tell the house is going to be quite airtight.
| Entrance Walls & Roof |
| Roofdeck over family room |
| Mudroom/garage wall - pre scraping |
Wednesday, July 23, 2014
HVAC going in! Inspections!
HVAC system going in. We're going with a Trane XV20i heatpump system. With a seperate HRV system to bring in fresh air since we're doing such a tightly insulated house.
| duct runs for HRV & HVAC |
| Main unit overhead |
We did pass more or less our rough-in inspection. I have a nice list to go fix but we're moving forward with insulation (spray foam on roof and exterior non sip walls) this week! More pics to come. With any luck, drywall starts next week and we start the home stretch for the finishings.
Subscribe to:
Posts (Atom)






