I realized just looking at the site that there wasn't a good series of shots showing the 'finished' result outside the house. So here's a few:
Tuesday, November 18, 2014
Monday, November 3, 2014
Neighbors
So every morning we're greeted outside our bedroom by deer. I think they like our house very much. We often find them licking our windows I'm not quite certain why.
HERS rating...
This weekend we did the blower door test as well as duct leakage and overall leakage. Our energy rater Steve stated this is the tightest house he's tested. I'm assuming thats a pretty good thing. :-) Hopefully all that will show up on our low PG&E bills..
Steve setting up the blower door |
During the duct leakage testing, all the supplies are capped |
Thursday, October 16, 2014
Retaining walls..
These were required to pass our final. I think they came out looking quite nice. They are made from mossrock. I think it will blend in nicely with the hillside once we have the plantings in.
Monday, October 6, 2014
Setting up some things..
We were able to move some of our things in.. I've been so busy I haven't been able to post in the last couple of weeks. I promise I'll get some pictures of the outside together. Here's the only one I've found on my phone.
You can start to see the inside come together. This is the kitchen area of the great room.
You can start to see the inside come together. This is the kitchen area of the great room.
Thursday, September 18, 2014
Monday, September 15, 2014
Finishing work
Its been a while since I've posted. Its just been crazy trying to line up and get the finish work done.
We've got the floors mostly down and the trim going in. A couple of the rooms are actually all the way done. Appliances and countertops are in and finish electric is going on. And we just bought what will be our stair treads just yesterday..
More pics to come..
We've got the floors mostly down and the trim going in. A couple of the rooms are actually all the way done. Appliances and countertops are in and finish electric is going on. And we just bought what will be our stair treads just yesterday..
Outside finishing up |
Kitchen finishings going in |
Thursday, September 4, 2014
So this happened..
Tuesday, September 2, 2014
Monday, September 1, 2014
Kitchen and flooring beginnings..
Wednesday, August 27, 2014
Driveway started..
Lamorinda Weekly Article
The Lamorinda Weekly just published a story on our project. Take a look!
http://www.lamorindaweekly.com/archive/issue0813/Green-House-Rises-on-Lafayette-Hillside-The-paint-is-green-but-so-is-the-entire-structure.html
http://www.lamorindaweekly.com/archive/issue0813/Green-House-Rises-on-Lafayette-Hillside-The-paint-is-green-but-so-is-the-entire-structure.html
Bathroom Tile
Tile guys have been working hard the last week. Tile floors are all in and the shower and tub walls are nearly done.
Thursday, August 21, 2014
Pics from today! Solar and some color..
From the pictures you can see the challenge of the solar panel location.. its only a 2.7kw system but it should take care of most of the house energy use.
Next steps: we should have rock going up the front face this weekend, last stucco coat going on with the integral color, and trenching should start for the sewer connection. Oh and tile is going in on the inside!
The only real vantage point that you can see the solar cells |
Thats the first set, the 2nd set is behind them |
Little bit of coloring going on the front |
Next steps: we should have rock going up the front face this weekend, last stucco coat going on with the integral color, and trenching should start for the sewer connection. Oh and tile is going in on the inside!
Friday, August 15, 2014
Painting!
Sunday, August 10, 2014
Stucco - Scratch Coat
So this weekend the stucco work began. The 'scratch coat' is on!
Inside, the mudding continues. This week they should finish and the texturing will start inside. Afterwards is paint. I'm scheduling the cabinets and floors to show up soon therafter.
Inside, the mudding continues. This week they should finish and the texturing will start inside. Afterwards is paint. I'm scheduling the cabinets and floors to show up soon therafter.
Subscribe to: