Mostly rebar work this time around.
Wednesday, December 25, 2013
Some pics from a different vantage point
Sunday, December 22, 2013
Almost ready for main lower slab pour
Pictures from this past weekends trip. The main slab that supports the large retaining wall is almost ready to be poured.
Monday, December 16, 2013
Weekend visit pictures
More timelapse fun!
I've been playing with the settings on the speed of the timelapse. Here we are still at 1 pic every half hour. But the framerates I'm uploading have been squished somewhat. The latest one I'm showing 5frames/sec. The prior one I'm showing 1 frame/sec. Since Youtube has controls to speed up and slow down I think this may strike a happy medium. Let me know what you think.
This is at 5fps:
1fps:
This is at 5fps:
1fps:
Sunday, December 8, 2013
Thursday, December 5, 2013
Wednesday, December 4, 2013
3rd material shows up!
Concrete, steel .. now WOOD. Unbelievable amounts of wood are used for setting up forms for concrete. I'm hoping some of it can be recycled for something else on the build. Its starting to look like a structure finally!
Monday, December 2, 2013
Trenching for grade beams
After thanksgiving I went up to take a look at the progress..
Concrete has been poured for all the piers. They are now trenching and prepping for the forms for the interconnecting gradebeams. It will be quite a structure when completed. I was suprised at how much wood they will be using for the forms. I have to think of ways to re-use those forms for something.
Concrete has been poured for all the piers. They are now trenching and prepping for the forms for the interconnecting gradebeams. It will be quite a structure when completed. I was suprised at how much wood they will be using for the forms. I have to think of ways to re-use those forms for something.